Control Account (控制账户)

news/2024/7/5 9:33:19
Control Account 在项目的进度管理中首次被提到(PMBOK 2004 3rd Edition P129),第一次看到这两个英文单词很是奇怪为什么一个WBS的分解层次会用到Account这个单词?一定是有原因的。

在随后的项目费用管理中给出了答案(PMBOK 2004 3rd P158),Control Account是项目费用核算的WBS单元,每个Control Account具有一个代码或者编号并与组织的会计体系对应。

Control Account 不仅是WBS的一个分解层次、费用管理中的一个核算单元,它更是项目管理中的一个 Control Point集成了scope, schedule, budget, actual cost, measurement of performance.  在组织中与其对应的是组织的某个组织分解结构(OBS) (PMBOK 2004 3rd P355). 基于Control Account的计划即为Control Account Plan,其中包含了明确的work, schedule和time-phased budget.(PMBOK 2004 3rd P356)

下面这些内容有助于更好的理解上面提到的Control Point:

To provide the responsible contract manager with technical, schedule, and other needed resource information, the management control system must be keyed to the same WBS element and organizational unit. The WBS level at which the management control system is established is primarily a function of the magnitude of the program and the type of product required by the contract. The responsible organizational level is a function of the company's management span of control and upper management's desire to delegate the responsibility for WBS elements to lower management levels. In identifying control accounts, the contractor is expected to establish organizational responsibilities at meaningful and appropriate levels. Otherwise, the contractor's existing management control systems and responsibility assignments may be affected adversely.

Virtually all aspects of the contractor's management control system (i.e. technical definition, budgets, estimates, schedules, risk management, work assignments, accounting, progress assessment, problem identification, and corrective actions) come together at the control account level. Performance visibility is directly relatable to this level of detail.

As the end product is subdivided into smaller subproducts at lower WBS levels, the work effort required by each element can be identified and assigned to functional organizational units. (注:前面一句又解释了WBS是面向可交付成果的 PMBOK 2004 3rd P112)The contractor will assign management responsibility for technical, schedule, and other performance criteria at lower levels within the WBS. The management control system will keep the lower levels of the WBS visible as it interfaces with the organization. At the juncture of the WBS element and organization unit, control accounts are established and performance is planned, measured, recorded, and controlled. To this end, the technical requirements for the work and work product must be specified; the work scheduled, budgeted, and performed; and attainment of specified technical requirements verified.





http://www.niftyadmin.cn/n/3657220.html

相关文章

蚁群算法浅谈

本文参考:http://www.cnblogs.com/biaoyu/archive/2012/09/26/2704456.html http://blog.163.com/ykn_2010/blog/static/1420333362012111411258466/ 简介 蚁群算法(ant colony optimization, ACO),又称蚂蚁算法,是一种用…

基于nb-iot和arduino的气象站(一)

基于nb-iot和arduino的气象站(一)温湿度和紫外线传感器 上一篇已经介绍了项目的大概情况。 这一篇先讲温湿度传感器和紫外线传感器的使用。 一、温湿度传感器 我使用的温度传感器为DHT21。 DHT21数字温湿度传感器是一款含有已校准数字信号输出的温湿…

One of Activity Attributes - effort type

PMBOK 2004 3rd P130中提到活动的属性可以包括该活动的类型,例如 level of effort(LOE), discrete effort(DE) and apportioned effort(AE), 第一次看到这几个概念,从字面不太好理解其含义,在这里找到了一些解释,可以帮助理解:A W…

基于nb-iot和arduino的气象站(二)

基于nb-iot和arduino的气象站(二)PM2.5和GPS传感器 上一篇介绍了温湿度传感器和紫外线传感器的使用。 这一篇介绍pm2.5和GPS传感器的使用。 一、PM2.5传感器 我使用的传感器为DSL-03。 DSL-03是一款激光式PM2.5传感器,内置激光器和光电接…

Apache网络爬虫框架nutch安装教程

简介 Nutch 是一个开源Java 实现的搜索引擎。它提供了我们运行自己的搜索引擎所需的全部工具。包括全文搜索和Web爬虫。尽管Web搜索是漫游Internet的基本要求, 但是现有web搜索引擎的数目却在下降. 并且这很有可能进一步演变成为一个公司垄断了几乎所有的web搜索为其谋取商业利…

Some insights on PDM, ADM and Schedule

这篇文章比较了PDM(Precedence Diagramming Method)与ADM(Arrow Diagramming Method)的不同, 并认为PDM是最适于进行CPM(Critical Path Method) Schedule的. 文章中有几个观点很好:1. A PDM schedule is simply a bar chart with connecting lines and arrows that …

基于nb-iot和arduino的气象站(三)

基于nb-iot和arduino的气象站(三) 上一篇介绍了pm2.5和GPS传感器的使用。 这一篇介绍nb-iot模块的使用。 一、NB-IoT,模组介绍与调试 我使用的nb模组为基于移远BC-95设计的开发板NB101,为谷雨公司产品。选用这款产品是因为这个…

Activity Duration Estimating technique - PERT铪铪铪

在画出项目活动网络图,准备寻找关键路径之前,必须先将每个在活动用时(Duration)进行估算,PMBOK 中提到的几种估算方法(PMBOK 2004 3rd P141-P142)中有一种叫做Three-Point Estimates,这其实就是PERT方法 - Program Evaluation and…